Green River Bridge closed this weekend

It’s a planned repair of the extension joint, which necessitates a full closure.

Commuters looking to drive on SR 169 this weekend should expect to add a few minutes to their trip, as the Green River Bridge will be closed.

According to the Washington State Department of Transportation Communications Consultant Mariah Johnson, the closure is for a planned repair of the bridge’s expansion joints. The bridge, also known as the Kummer Bridge will be closed starting at 9 p.m. Friday, April 14, to 5 a.m. Monday, April 17.

Johnson said the joint runs the length of the bridge, which necessitated both lanes being closed, and the cure takes a long time to set after the repairs are made, requiring the full weekend for the project.

ADVERTISEMENT
0 seconds of 0 secondsVolume 0%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

She added that crews picked the weekend for the closure to affect as few work commuters as possible.

Suggested detours include:

Northbound:

■ Turn left on to SE 400th St

■ Turn right on to 212th Ave. SE (which turns into 212th Ave. SE)

■ Turn right on to SE Auburn Black Diamond Road (which turns into Roberts Drive)

■ Detour ends back at SR 169

Southbound

■ Turn right on to Roberts Drive (which turns into SE Auburn Black Diamond Road).

■ Turn left on to 218th Ave. SE (which turns into 212th Ave. SE).

■ Turn left onto SE 400th St.

■ Detour ends at SR 169.

A separate closure of the Green River Gorge Bridge, located on SE Green River Gorge Road, is scheduled on April 18 by King County.

Tags: